At the Suzano – Papel e Celulose project site, in Maranhão, a complete air conditioning system was provided for the Electric Rooms with 24-hour operation, equipped with an air conditioning system for cold water with special filtration, through chemical filters to combat corrosion due to the atmosphere of the production area. The total capacity of the project is 1,900 TR.

“Work completed in 2014”.

VOTORANTIM PAPEL E CELULOSE – TRÊS LAGOAS

In the Votorantim Project, a complete air conditioning system was provided for the Electric Rooms with 24-hour operation, equipped with an air conditioning system for cold water with special filtration, through chemical filters to combat corrosion due to the atmosphere in the production area. . The total capacity of the project is 1,650 TR.

“Work completed in 2012”.