Projeto Sirius
COMITE OLIMPICO SEDE RIO 2016
ESTÚDIOS DA REDE GLOBO – SP
CEITEC – RS

Projeto Sirius

The National Synchrotron Light Laboratory, LNLS, is building Sirius, a fourth-generation synchrotron light source. The project is considered one of the most advanced in the world and will provide many advances in scientific research fields such as materials science, nanotechnology, biotechnology, physics, environmental sciences and many others. We from Heating & Cooling, were responsible for installing the air conditioning system with a capacity of 3,150 TR.

“Work completed in 2019”.

COMITE OLIMPICO SEDE RIO 2016

The Rio 2016 Olympic Committee, located in Rio de Janeiro, has a modular building built with containers, a project that speeded up construction time. The air conditioning system has redundancy and high efficiency. Equipped with cooling units, with magnetic bearing and 1,000 TR of total capacity. The air distribution system is specific to meet the total occupancy flexibility of the enterprise with special VAV type diffusers.

“Work completed in 2016”.

ESTÚDIOS DA REDE GLOBO – SP

For Rede Globo SP Studios, one of the biggest concerns was to provide the environments with an air conditioning system that, in addition to maintaining the temperature in ideal working conditions, should guarantee a very low noise level. The system adopted was indirect expansion, with a thermal capacity of 1,160 TR, with water thermoaccumulation.

“Work completed in 2012”.

CEITEC – RS

The new manufacturing unit of CEITEC – Center of Excellence in Advanced Electronic Technology, in Porto Alegre – RS, is the first to manufacture the complete chip production cycle in the country. Of the total 9,500 m² built, 2,000 m² are clean rooms, 800 m² of which are Class 100 (ISO 5) and 1200 m² are Class 10000 (ISO 7).

The chilled water plant provides 2,500 TR in 2 temperature levels; systems with generation and distribution of hot water, water and process vacuum were also supplied by Heating & Cooling for the complex.

“Work completed in 2008”.